Place of Origin: | China |
Brand Name: | Tailiang |
Model Number: | BG20 |
Minimum Order Quantity: | 1set |
---|---|
Price: | Negotiation |
Packaging Details: | Export Standard Packing |
Delivery Time: | 100days |
Payment Terms: | L/C, T/T, Western Union, MoneyGram |
Supply Ability: | 60sets per month |
High Precision SUS302 Tube Mill Line , Ss Tube Mill Machine 0-8M / Min BG20
Description of product
Summary:
This equipment is specially used for producingΦ8-Φ25.4mm, δ0.5-1.5mm stainless steel straight seam welded pipe. It made by refined materials in high precision and equipped with fixed length cutting saw. The main machine includs forming, welding ,sizing and straightening device. The composition of equipment is from uncoiler to fixed length-cutting saw. Rolling speed can be adjusted correspondingly within suitable range of pipe diameter and wall thickness.
Raw material (steel coil)→uncoiling→shearing and end welding→non-power leveling→forming and shaping→TIG welding→Polishing burrs outside of weld seam→cooling→sizing and shaping→roughly straightening→ fixed length cutting→finished pipe→run-out table
1.5 Milling speed: 0-8M/min
1.6 Product precision: maximum tolerance of diameter±0.05mm
1.7 Ar-arc welder: 400A
1.8 Advised user’s necessary accessories (only for reference):
Introduction of main components:
Uncoiler:
Structure type: Double-side 360ºrotary manual expanding tight, which insure steel coil feeding alternatively and make steel strip going into accumulator freely.
Applicable range: 25-80mm steel strip width, 0.5-1.5mm thickness, Φ600-Φ1000mm steel coil O.D., Φ450-Φ550mm steel coil I.D., Max.500kgs steel coil weight.
Feeding & leveling device:
Form: Five rolls are passively leveled for straightening strip steel before it is fed into forming unit.
Forming device:
Mainly roughly mill-forming steel strip and controlling weld seam.
a. Horizontal roll stand: (Three fin pass)
Quantity: 8
Structure: 45#Cast steel, double housing, changing rolls in the side
Diameter of horizontal roll’s shaft: Φ36mm, material: 42CrMo
b. Vertical roll stand:
Quantity: 10(Including one guiding roll stand)
Type: Passive rotation
Diameter of vertical roll’s shaft: Φ20mm, material: 45# Forging steel
c. Adjusting method: Single spiral pole manual adjusting
d. One set of bed for installation
(3) Guiding extruding and welding scraping apparatus:
a. One set of guide roll stand for controlling direction of pipe seam to insure pipe seam flatly and straightly entering into extruding rollers.
b. Two sets of extruding roll stand for controlling weld seam to realize successful welding.
c. Two sets of scraper frame for scraping outside weld seam
(4) Sizing device: Mainly fine shaping pipe after welding and controlling size accuracy. Each 5 sets of horizontal roll stand, vertical roll stand, three sets of gearbox branch (double connection), and 10 sets of universal shaft. (Structure same as forming device)
(5) Roughly straightening machine frame:
a. Usage: It is mainly used for roughly straightening of finished pipe.
b. Form: Turk’s head type, 4 rolls single-side two sets
c. One installation bed along with sizing machine.
(6) Main driving system: The main unit is connected with main reducer by main motor and transmits power to gearbox branches, then gearbox branches drive upper and down shafts on horizontal roll frame.
a. Master motor: Z4 series, DC 7.5KW, one set
b. Universal transmission shaft 26 pcs
2.4 Pneumatic tracking cutting saw:
(1) Cutting method: Pneumatic tracking and automatic cutting
(2) Cutting thickness: δ0.5-1.5mm
(3) Cutting O.D.: Φ8-Φ25.4mm
(4) Cutting length: 4-8m
(5) Cutting motor: 3KW
(6) Cutting tolerance: ≤10mm
(7) Cutting motor: 3KW
(8) Controlling system: By encoder.
2.5Ar-arc welder: 400A(TIG system)
2.6Finished pipe passing conveyor:
Welded frame structure equipped with sizing signal system
Note:
(1) Rolls for welded pipe will be ordered additionally according to type and specification provided by customer.
Material: Cr12Mov
(2) When signing sales contract, we will discuss the following expense: Need two persons, the buyer should charge of Visa, return ticket, food and accommodation and person/day for salary.
(3) The date of delivery:90 days later after receiving 30% of total value.
(4) The terms of payment: 30% should be paid after signing S/C, and the remaining 70% before delivery.